Access Gate Hub
An advanced Gate Hub enabling seamless gate access control via connected Access readers or Intercom.
Device €287.90 + installation on site €25.00
Included: the device, mounting, connection and commissioning to the usual extent. Travel costs are quoted to you in advance.
Every site is different. If yours needs more — new cable runs, wall openings, work at height or extra devices — you receive a binding quote before we start. Nothing is charged extra without your approval.
Access Gate Hub installation service
We install and configure the Access Gate Hub on site and hand it over documented. Installation across Germany by quote — we reply the same working day.
- VLANs for office, guests, phones and cameras
- Clean patching with labelled ports
- Firmware check and secured management access
- Configuration backup and port documentation
- Charged by time, minimum one hour; the amount, travel and material are in the quote.
Payment
- Transfer
- Invoice
- Pay after installation and handover
- SSL-encrypted connection
Installed across Germany
By appointment, on site
Reply the same working day
Email, phone or WhatsApp
Installation by quote
Written quote first
Documented handover
Settings and cabling on paper
Product overview
An advanced Gate Hub enabling seamless gate access control via connected Access readers or Intercom.
Who it is for
- Features
- (2) Gate operator terminals (dry)(1) Lock terminal (12V) for side door(1) AUX terminal for an external siren(5) Additional inputs (sensors and emergency)License plate unlock (when paired with AI Camera)Connect and power using PoE++Connect up to four UniFi Access readers or UniFi Protect cameras
Technical specifications
- LEDs
- W/B <a href="" target="_blank" rel="noopener noreferrer">Learn More</a>
- Weight
- 460 g (1 lb)
- Buttons
- (1) Factory reset
- Mounting
- DIN-rail (Included)
- Dimensions
- 175 x 126 x 26 mm (6.9 x 5 x 1")
- Power Method
- PoE++, UL 294 Power-limited Class 2 PSU, UL 60950-1/62368-1 LPS/PS2 PSU
- UL 294 Level
- Destructive attack: Level I, Line security: Level I, Endurance: Level I, Standby power: Level I
- Digital Input
- Gate exit request, gate position, side door exit request, side door position, emergency
Show all 32 specificationsShow fewer
- PoE Interface
- (1) PoE++ input, 50V DC, 1A (4) PoE+ outputs, 50V DC, 30W per port (Max 55W aggregated)
- Certifications
- CE, FCC, IC, UL 294, CAN/ULC-60839-11-1
- NDAA Compliant
- Yes
- Input Terminals
- (1) Gate exit request (1) Gate position (1) Side door exit request (1) Side door position (1) Emergency
- Supported Doors
- 1 gate, 1 side door
- Dry Output Relay
- (2) Operator: rated 30V DC, up to 1A (1) Aux: rated 30V DC, up to 1A
- UL 294 Statement
- Compliance with IEEE 802.3 specifications was not verified as part of UL 294., The equipment is intended to comply with the section of the National Electrical Code, ANSI/NFPA 70, Article 725.121, Power Sources for Class 2 and Class 3 Circuits.
- Enclosure Material
- Polycarbonate
- Maximum User Count
- 6,000
- Networking Interface
- (5) 10/100/1000 Base-T
- Powered Output Relay
- Side door lock: 12V DC, up to 1A
- Software Information
- The software version can be checked at <a href="" target="_blank" rel="noopener noreferrer"></a>
- Indoor and Outdoor Use
- Indoor only: device itself, Outdoor: with waterproof junction box
- Management Application
- Access
- Max. Power Consumption
- 22W (Without PoE output), 60W (With PoE output)
- CAN/ULC-60839-11-1 Grade
- Grade assignment: I
- PoE Cabling Requirements
- Cat 5e cabling is the minimum performance category recommended. The performance category utilized should match the transmission speed required at the installation site., The minimal conductor gauge permitted to connect between the PSE or power injector and the PD shall be 26 AWG (0.13 mm² ) for patch cords; 24 AWG (0.21 mm² ) for horizontal or riser cable.
- Ambient Operating Humidity
- 5 to 90% noncondensing
- Ambient Operating Temperature
- -30 to 60° C (-22 to 140° F)
- Recommend Max. Cable Length · Other locks (1A)
- 24 AWG length: 9 m (30 ft), 22 AWG length: 15 m (49 ft), 20 AWG length: 24 m (79 ft), 18 UACC-Cable-DoorLockRelay length: 36 m (118 ft)
- Document number, and issue date and/or revision level
- UA-Hub-Gate, V01
- Recommend Max. Cable Length · UA-Lock-Electric (400mA)
- 24 AWG length: 25 m (82 ft), 22 AWG length: 42 m (138 ft), 20 AWG length: 66 m (217 ft), 18 UACC-Cable-DoorLockRelay length: 100 m (328 ft)
- Recommend Max. Cable Length · UA-Lock-Magnetic-270kg (800mA)
- 24 AWG length: 12 m (39 ft), 22 AWG length: 20 m (66 ft), 20 AWG length: 30 m (98 ft), 18 UACC-Cable-DoorLockRelay length: 46 m (151 ft)
- Recommend Max. Cable Length · UA-Lock-Magnetic-540kg (500mA)
- 24 AWG length: 20 m (66 ft), 22 AWG length: 32 m (105 ft), 20 AWG length: 51 m (167 ft), 18 UACC-Cable-DoorLockRelay length: 80 m (262 ft)
Questions about the Access Gate Hub?
Ask before you order: compatibility, PoE budget, cabling or mounting. We reply the same working day.
Access Gate Hub installation: installation and configuration
We install and configure the Access Gate Hub on site and hand it over documented.
1Rack installation
Mounted, earthed and powered, with cable management so the rack stays serviceable.
2VLAN configuration
Office, guest, VoIP and camera traffic separated, trunks to the firewall and access points.
3Replacing an old switch
Old configuration read out and carried over, changeover planned to keep downtime short.
4Documentation
Port plan, VLAN list and configuration backup handed over.
What is included for this product
- VLANs for office, guests, phones and cameras
- Clean patching with labelled ports
- Firmware check and secured management access
- Configuration backup and port documentation
Price and process
Charged by time, minimum one hour; the amount, travel and material are in the quote.
Tell us briefly what should be installed and where. We reply the same working day and agree an appointment — installation across Germany.
Documents
Frequently asked questions
How is the Access Gate Hub powered?
Over the network cable (Power over Ethernet): PoE++, UL 294 Power-limited Class 2 PSU, UL 60950-1/62368-1 LPS/PS2 PSU. No socket is needed at the mounting point, but the switch must supply enough PoE budget — we check that before installation.
Can the Access Gate Hub be installed outdoors or in unheated areas?
The manufacturer specifies an operating temperature of -30 to 60° C (-22 to 140° F). We plan the mounting point and cable entry to match.
What does installing the Access Gate Hub cost?
Charged by time, minimum one hour; the amount, travel and material are in the quote. For a firm figure, tell us the site and how many units.
Do you install outside Berlin?
Yes — installation across Germany, by appointment.
How quickly will I hear back?
The same working day. We do not offer a guaranteed response time; the appointment is scheduled by urgency.
Related products
More products we supply and install







