Server room cooling and UPS

We set up server rooms for small and mid-sized businesses: calculate the heat load from the actual power draw, plan the cooling and coordinate it with the refrigeration contractor, and select, install and configure a UPS so the servers shut down in order when the power fails. You receive documentation of load, runtime and shutdown sequence.

A small server room is often a storeroom with a rack that gets too warm in summer and a UPS whose battery nobody has checked. There is no dedicated law for server rooms; what counts are the manufacturers’ specifications, fire safety and your insurer, with the BSI’s IT-Grundschutz as a guide. We calculate load and cooling, install the UPS and document what happens when the power fails.

  • Reply the same working day
  • Written quote
  • Anywhere in Germany
  • Payment after handover

Key figures

Recommended equipment inlet temperature (ASHRAE)
18–27 °C
Electrical power drawn becomes heat – that is the heat load
1 W → 1 W
BSI module for small technical rooms
INF.5
Standards and sources
Rooms
Server room, technical room, rack in the office
Cooling
Heat load calculated, solution planned
UPS
Selection, installation, shutdown software
Test
Shutdown test at handover
Billing
Time and materials; materials itemised
Service area
Anywhere in Germany
Reply
The same working day
Payment
After handover

Use cases

Why businesses call us

The typical reasons:

Services

What we take on

  • Assessment: equipment, power draw, room, existing cooling and power supply
  • Heat-load calculation from the equipment’s electrical power
  • Cooling plan: airflow in the rack, air conditioning or another solution, coordinated with the refrigeration contractor
  • UPS selection by load and the runtime you need
  • Installation of plug-in rack UPS units, setup of the network card and shutdown software
  • Orderly server shutdown on power failure, tested
  • Rack order: blanking panels, cable management, power distribution (PDU)
  • Documentation: load, runtime, shutdown sequence, battery installation date

What you get at handover

  • Documentation of load, heat load, UPS runtime and shutdown sequence
  • Shutdown test report
  • Invoice only after handover

Comparison

Which cooling fits?

The heat load decides, together with the room and the building:

Exhaust air out, supply air from a cooler areaSuitsLow loadKeep in mindOnly works while the supply air stays cool enough in summer
Split air conditionerSuitsMost small server roomsKeep in mindRefrigerant work only by a certified contractor; outdoor unit and condensate; in a rented building the landlord must agree
Portable air conditionerSuitsA stopgap, for example after a failureKeep in mindExhaust hose and condensate; usually unsuitable as a permanent solution
Rack with its own coolingSuitsHigher load in little spaceKeep in mindMore expensive to buy; cooling and rack planned together

Which solution fits is clear after the heat-load calculation. We put it in the quote with the reasoning.

Acceptance

What the shutdown test shows

Whether a UPS helps in an outage only shows in a test under real load:

Shutdown test

  • Power failure simulated, by agreement
  • Servers shut down in the defined order
  • Runtime measured under your actual load

Documentation

  • Power draw per device and in total
  • Heat load and the chosen cooling
  • UPS model, battery installation date, shutdown sequence

Without a test nobody knows whether the shutdown software works – otherwise you find out at the next power cut.

Cost

What does it cost?

You get a quote after the assessment. It states:

ItemHow it is charged
MaterialsUPS, batteries, PDU, accessories: itemised
Air conditioner and refrigerant workThe refrigeration contractor’s quote, separately
TravelStated up front
Planning, installation and setupTime and materials, amount stated in the quote
BillingAt least 1 hour, then in full hours
PaymentAfter the work and handover: SEPA bank transfer, invoice or PayPal

What drives the price

  • Number and power of the devices
  • UPS runtime you need
  • The cooling chosen
  • Condition of rack and cabling
  • Travel

Extra work that only shows up on site is agreed with you first – nothing is charged without your consent.

  • SEPATransfer
  • Invoice
  • PayPal

For your purchasing department

  • Quote

    In writing, up front: labour, material and travel are stated before any work starts.

  • Payment

    After the work and handover: SEPA bank transfer, invoice or PayPal. No prepayment.

  • Contact

    We reply the same working day, in English or German.

  • Supplier details

    UltraTech Germany · Leipziger Straße 40, 10117 Berlin, Germany · VAT ID DE463530263 · Legal notice

Quote

For an accurate quote

Whatever you do not know, we clarify during the assessment:

  • Equipment in the room: servers, storage, switches, firewall – with models
  • Room size, windows, sun exposure
  • Existing cooling and UPS: model and age
  • Runtime you need
  • Rented or owned building (for an outdoor unit)
  • Photos of the room and rack
  • A contact on site

Process

How a job runs

  1. 1

    Enquiry

    Tell us the equipment, the room and what bothers you – too warm, old UPS, new room. Photos of the room and rack help. We reply the same working day.

  2. 2

    Assessment

    We record equipment and power draw, room size, windows, existing cooling and power supply.

  3. 3

    Quote

    Heat load, proposed cooling, UPS and materials are in the quote. Work on the refrigerant circuit comes with a refrigeration contractor’s own quote.

  4. 4

    Installation and setup

    Fit the UPS and accessories, configure the shutdown software, tidy the rack – scheduled around your business, outside business hours if you prefer.

  5. 5

    Shutdown test and handover

    Once agreed, we simulate a power failure and check that every server shuts down in order. Payment is due after handover.

FAQ

Frequently asked questions

What temperature should a server room be?

ASHRAE recommends 18 to 27 °C for the air entering the equipment. What counts is the temperature at the front of the servers, not somewhere in the room – and the limits on your equipment’s datasheet.

How is the heat load calculated?

Almost all the electrical power the equipment draws ends up as heat in the room. The heat load is therefore essentially the sum of the power draw of all equipment, plus heat from outside through walls, windows and sun. We use measured or realistic figures rather than the maximum rating of the power supplies.

Can a server room be cooled without air conditioning?

With a low load, sometimes: exhaust air to the outside and supply air from a cooler area. That only works as long as the supply air stays cool enough in summer. The heat-load calculation shows whether it will work for you.

Who may install air conditioning in a server room?

Work on the refrigerant circuit – installation, servicing, leak checks – may only be done by people holding the required certificate (Art. 10 Regulation (EU) 2024/573). A certified refrigeration contractor does that part; we supply the heat load, the location and the coordination with the rack.

Is a UPS allowed in the server room?

Yes. For stationary batteries, EN IEC 62485-2 governs the ventilation of the installation location: hydrogen can form during charging, and the ventilation needed is calculated from the battery and charging current. For larger UPS systems we check ventilation against the manufacturer’s data before quoting.

How long should a UPS bridge an outage?

At least until every server has shut down in order, plus a margin. Bridging a long outage needs far more battery capacity or a generator. The runtime under your actual load is in the documentation.

When does the UPS battery need replacing?

It depends on the battery and above all on temperature; the expected service life is on the datasheet. We record the installation date in the documentation, and the UPS self-test shows whether the runtime is still sufficient.

Are there legal requirements for server rooms in Germany?

There is no dedicated law. Fire safety under the state building code applies, as do your insurer’s conditions and – for organisations covered by NIS2 – the duties under the BSIG. As a guide, the BSI’s IT-Grundschutz describes requirements for server rooms in modules INF.2 and, for small technical rooms, INF.5.

Who connects the UPS to the electrical installation?

Plug-in rack UPS units we install ourselves. We do not work on the fixed electrical installation: a hard-wired connection is for your qualified electrician, with whom we agree load and circuit protection.

How do we pay?

After the work and handover, by SEPA bank transfer, on invoice or with PayPal.

Sources

Standards and sources

Where a standard or a law gives a number, this page states it with its source. Where sources disagree, we give no number – your specification decides.

Show sources
  1. [1]ASHRAE TC 9.9: Thermal Guidelines for Data Processing Environments
  2. [2]BSI IT-Grundschutz: INF.2 data centre and server room (2023 edition, German)
  3. [3]BSI: IT-Grundschutz modules, 2023 edition (INF.5, German)
  4. [4]Regulation (EU) 2024/573 on fluorinated greenhouse gases, Art. 10
  5. [5]EN IEC 62485-2:2018 – safety requirements for stationary batteries

Enquiry about Server room cooling and UPS

  • Free initial consultation
  • Reply the same working day
  • Work by appointment
  • across Germany
Request a quote+49 30 50930365

For an accurate quote

  • Equipment in the room: servers, storage, switches, firewall – with models
  • Room size, windows, sun exposure
  • Existing cooling and UPS: model and age