# Network cabling for offices, warehouses and sites

> We install network cabling for offices, warehouses, workshops, practices, shops and administrative buildings: Cat 6A copper, and fibre where distances grow long or buildings are linked. Work follows EN 50173, in existing buildings and new builds, across Germany. Every link is certified against its class, labelled and handed over with a test report.

URL: https://utechit.de/business/structured-cabling
Alternate language version: https://utechit.de/de/business/inhouse-verkabelung
Language: en
Provider: UltraTech Germany, Leipziger Straße 40, 10117 Berlin
Service area: Deutschland

An office and a warehouse need the same foundation but not the same plan. This page explains what matters for each kind of building: how many outlets, which routes, when fibre instead of copper, and what is measured at acceptance. Where an electrical contractor provides the pathways, we take on the data side. We work in English or German.

## Key figures

- **90 m** — Permanent link, EN 50173-1
- **100 m** — Channel including patch cords
- **Class EA** — Cat 7 cable with Cat 6A modules

## When a site is re-cabled

- **New build or refurbishment** — Plan outlets, distributors and pathways while walls and ceilings are open – the cheapest moment to do it.
- **Retrofitting an existing building** — New workstations in occupied rooms: trunking, suspended ceiling or raised floor, agreed with management and tenants.
- **Fibre into the tenant units** — If the fibre connection ends in the basement, we run the fibres up the risers into the units and splice them.
- **Access points and cameras** — Cables to ceilings and façades, with enough headroom for PoE and the next generation of devices.
- **Connecting floors and buildings** — Risers and links between buildings, usually in fibre, with floor distributors at both ends.
- **For electrical contractors** — You provide the pathways; we pull, terminate and test – with reports for your acceptance.

## Cabling by type of building

The EN 50173 standard is split into parts: part 1 applies generally, part 2 to offices, part 3 to industrial premises, part 6 to building services such as cameras and access points. What that means in practice depends on where the work is.

### First: outlets, spare capacity and power over the cable

In cabling, what was planned too tight ends up costing most. Adding an outlet later is almost always more work than planning it in. So we count devices, not desks: computer, phone, docking station, printer, meeting-room display, plus access points and cameras on the ceiling.

Many of these devices draw power over the network cable (PoE). Under IEEE 802.3bt a port delivers up to 90 W, of which 71.3 W is guaranteed to arrive at the device. The more current, the more a cable bundle heats up, and the more it matters how many cables share a pathway. The limits are in ISO/IEC TS 29125 and in the cable datasheet. We do not quote a blanket number: it depends on the cable and the pathway.

We also leave spare capacity: free ports in the patch panel and room in the pathway. How much makes sense we discuss at the site walk, with the floor plan in hand.

### Office

*EN 50173-2 – office premises*

In an office the job is usually an existing building where people already work. Cables run in sill trunking, suspended ceilings or raised floors. In German corridors and stairwells the cable-routing rules of the federal states apply (model: MLAR): cables there must be covered or run in trunking of non-combustible material. Penetrations through fire walls we agree with you beforehand. If you rent, read what the lease says about penetrations and restoring the space, and involve the landlord early.

Work is by appointment, in the evening or at weekends if needed, so the business keeps running. In open-plan offices where furniture moves often, a connection point in the floor or ceiling that feeds workstations with short cables pays off. A consolidation point allows that without every rearrangement needing new cable back to the distributor.

### Warehouse and logistics

*EN 50173-3 – industrial premises, depending on how the hall is used*

In halls, distance is the problem. Fixed cable from distributor to outlet may be at most 90 metres, and a hall is easily longer. The answer is a second distributor in the hall, linked by fibre. Between buildings, metal-free fibre cable is the usual choice anyway: it carries neither voltage differences between the buildings nor interference.

The devices hang high: access points under the roof or on columns, cameras at doors and ramps, plus scanner docks, label printers, terminals and time clocks. Where the access points go depends on the radio plan and the racking height, so the Wi-Fi survey comes before the cabling, not after. For work under the hall ceiling we plan access in, such as an aerial work platform; it appears in the quote as its own line.

Dust, temperature swings and cold in chilled areas call for components with a suitable protection rating and temperature range. We choose them from the datasheet and say in the quote which they are.

### Production and workshops

*EN 50173-3 and EN 50174-2 – separating power and data cables*

Where frequency inverters, motors or welders run, the interference environment is rougher than in an office. We route data and power cables apart, with shielded components and proper earthing. Where that cannot be avoided, fibre is the quieter choice.

We cable the IT network up to the connection point at the machine. The machine control and its fieldbuses belong to the machine builder or the automation engineer; we agree with them so that pathways and connection points fit together.

### Medical practice, law firm and care

*EN 50173-2 – office premises*

Operations must not stop. We work outside consulting hours or in sections, so treatment rooms stay usable. The distributor belongs in a lockable cabinet, not in a broom cupboard without a lock.

Where patient data and guest access share a building, separating the networks is part of the plan: separate outlets and networks per purpose. For devices with manufacturer requirements, such as imaging or lab equipment, we obtain those requirements first.

### Retail and branches

*EN 50173-2 and -6*

Tills, card terminals, cameras, Wi-Fi and displays need connections in places the floor plan often settles late. Refits happen after closing. With several branches a uniform build pays off: the same labelling, the same distributor layout, one test report per site. It saves time later when a technician stands in a branch they do not know.

We are based in Berlin and install across Germany.

### Schools, administration and public buildings

Here a bill of quantities usually decides. If you have one, we price against it; if not, we draw up the bill of materials ourselves. The test report against the agreed class is the basis of acceptance. Work happens in holidays, off-peak hours or in sections, agreed with the building management. Escape routes and fire compartments are settled before pulling cable.

### Apartment blocks and commercial property

If the fibre building connection ends in the basement, we run the fibres up the risers into the units and splice them. In commercial property we cable floors and tenant units, including for a single tenant. Who decides and who pays is covered on the in-building fibre page.

### Server room and distributors

Every cabling job ends in a cabinet. Patch panel, cable management, labelling and a port plan turn a tangle into a distributor that another technician understands in ten minutes. Power, cooling and UPS are separate topics.

## What we deliver

- Structured cabling in Cat 6A to the outlet, with Cat 7 installation cable if you prefer
- In-building fibre cabling, including risers
- Floor distributors built and connected to the main distributor
- The fibre building connection extended into tenant units
- Installation in trunking, cable trays, raised floors or suspended ceilings
- Cables to access points, cameras, phones, tills and scanners on ceilings, walls and racking
- Fibre links between halls and buildings
- Labelling, documentation and acceptance testing of every link

## Primary, secondary, tertiary: how cabling is structured

EN 50173 divides a site’s cabling into subsystems. We install all of them:

1. **Campus distributor** — Connects the buildings on a site, usually in fibre
2. **Building distributor** — Risers to the floors, copper or fibre
3. **Floor distributor** — Patch panels and switches per floor
4. **Horizontal cable** — Fixed to the outlet, 90 m at most
5. **Outlet** — Patch cords to the device, channel 100 m at most

If a workstation is more than 90 metres of cable from the floor distributor, no better cable helps: you need another distributor or a fibre link.

## Cable tester, qualification or certification?

Three checks that are often confused. Only one counts for acceptance:

| Check | What it shows | What it is for |
| --- | --- | --- |
| Cable tester (continuity) | Whether all conductors are terminated correctly | Checking the wiring – says nothing about transmission values |
| Qualification | Whether a link carries a given application, such as 10GBASE-T | Existing installations and fault finding |
| Certification | All transmission values against the class in EN 50173, such as Class EA | Acceptance, and evidence towards client and manufacturer |

Every link we install is certified against the agreed class. The report is part of the handover.

## Category is not class

Quotes often say “Cat 7”. What reaches the network is decided by the weakest component of the link:

**Components have categories**

- Cables, modules and outlets carry a category, such as Cat 6A or Cat 7
- Cat 7 installation cable is common in Germany and well shielded
- Usual in offices: Category 6A RJ45 modules

**Links have classes**

- The finished link is tested against a class, such as Class EA
- Cat 7 cable with Cat 6A modules forms a Class EA link
- Class EA carries 10 Gbit/s over 100 m – usually enough for an office

A Class F link needs Category 7 connectors instead of the usual RJ45 modules. If you pay for “Cat 7”, the report should show which class the link was tested against.

## What you get at handover

- Test report for every link against the agreed class
- Labelled outlets and patch panels, named as in the report
- Documentation of the port assignment
- Invoice only after handover

## What does structured cabling cost?

After the site walk we quote a fixed price with a bill of materials. The quote lists:

- **Pulling and terminating:** Fixed price after site walk
- **Materials:** Cable, outlets, patch panels, trunking: itemised
- **Testing and documentation:** Part of the job
- **Travel:** Stated in advance

What drives the price:

- Number of outlets
- Pathways: trunking, suspended ceiling, raised floor, wall openings
- New build or occupied building
- Copper, fibre or both
- Travel

 Payment after installation and handover: SEPA bank transfer, invoice or PayPal.

## For a quote that fits first time

With these details we prepare the site walk. A floor plan with the workstations marked helps most.

- Number of outlets per room, today and planned
- Floor plan, ideally with workstations
- New build, refurbishment or occupied building
- Where the distributor is or should be
- Possible pathways: trunking, suspended ceiling, raised floor
- Fibre needed between floors or buildings?
- Known fire compartments and escape routes
- Construction schedule and other trades on site

## How a job runs

1. **Site walk** — We look at pathways, fire compartments and existing distributors, and agree the number of outlets.
2. **Quote with bill of materials** — You see which materials go in and what the installation costs – as a fixed price.
3. **Installation** — Pulling, terminating and labelling. We keep the site clean and coordinate with other trades.
4. **Testing** — Every link is certified against the agreed class – not just checked for continuity.
5. **Documentation and handover** — You get the test report and port assignment. Payment is due after handover.

## Standards and sources

- EN 50173-1 – generic cabling systems
- [EN 50173-2 (office premises), -3 (industrial premises), -6 (distributed building services)](https://www.dinmedia.de/en/standard/din-en-50173-2/143079628)
- IEEE 802.3bt – Power over Ethernet, up to 90 W at the port, 71.3 W at the device (Type 4)
- ISO/IEC TS 29125 – telecommunications cabling for remote powering of terminal equipment
- [Model guideline on cable installations in buildings (MLAR, German)](https://www.umwelt-online.de/recht/bau/dibt/mlar.htm)
- Manufacturer data: Cat 6A / Class EA installation link with Cat 7 S/FTP cable (EFB-Elektronik K9201)

## Contact

Email: info@utechit.de
Phone: +49 30 50930365


---

## Provider

UltraTech Germany, Leipziger Straße 40, 10117 Berlin
Email: info@utechit.de · Phone: +49 30 50930365 (WhatsApp)
More: https://utechit.de/llms.txt · MCP: https://utechit.de/api/ucp/mcp
