# In-building fibre installation

> We install the fibre inside buildings across Germany: from the carrier’s entry point (Gf-AP) up the riser to a fibre outlet in every flat, office unit or floor – in apartment blocks, commercial buildings and single-family houses. We splice with our own fusion splicer, test every fibre and hand over a fibre plan any provider can connect to.

URL: https://utechit.de/business/in-building-fiber
Alternate language version: https://utechit.de/de/business/glasfaser-im-haus
Language: en
Provider: UltraTech Germany, Leipziger Straße 40, 10117 Berlin
Service area: Deutschland

Millions of buildings in Germany have fibre in the street but not inside. The missing part is the in-building network – Netzebene 4, from the basement to the units. It is the owner’s responsibility, and the owner can let the network operator build it or commission it directly. We build it independently of any provider: plan the route, lay the cable, splice, test every fibre and document all of it.

## Key figures

- **€540** — Maximum provision fee per flat if the network operator builds (§ 72 TKG)
- **§ 20 WEG** — Every flat owner can demand a fibre connection
- **7.5 mm** — Minimum bend radius of G.657.A2 fibre – the cable needs more

## Which buildings

- **Apartment blocks, property managers, WEGs** — A riser for the whole building, fibre into every flat or prepared up to the floor. A quote the owners can vote on.
- **Commercial and office buildings** — Separate fibres per tenant unit, floor distributors, a link to the server room. Every unit can have its own connection.
- **Single-family houses** — From the entry point in the basement to where the router and the desk are – granny flat or outbuilding included.
- **Halls and several buildings** — Fibre between buildings, halls and floors on one site, spliced into distributors at both ends.
- **Checking an existing network** — The building is cabled but one flat gets no signal: an OTDR trace shows where the fibre is broken or bent too tightly.
- **For electrical contractors** — You lay the ducts and cable, we splice, test and document – as your subcontractor.

## What we deliver

- Route planning from the Gf-AP up the riser and across the floors to every unit
- Installation in existing shafts, conduits and trunking, or surface-mounted
- Microducts or slim surface trunking where there is no conduit
- Building and floor distributors, splice boxes and fibre outlets (Gf-TA)
- Fusion splicing with our own splicer
- Spare fibres per unit, so further providers or services can connect later
- Every fibre tested – loss and OTDR – with a report
- Fibre plan showing which fibre serves which flat or unit; labelled fibres and outlets

## From the street into the flat

A fibre connection has two parts. The owner is responsible for the second:

1. **Operator’s network** — Line in the street up to the building
2. **Gf-AP** — Fibre entry point, usually in the basement
3. **Building distributor** — Splice onto the in-building network
4. **Riser and floors** — Shaft, conduit or trunking, floor distributors
5. **Gf-TA per unit** — Fibre outlet in the flat or tenant unit

The network operator builds up to the Gf-AP. From the Gf-AP onwards – Netzebene 4 – the owner decides who builds. That is the part we take on.

## Let the operator build, or commission it yourself?

Both are allowed. What differs for the owner:

| Question | Network operator builds | You commission it |
| --- | --- | --- |
| Who keeps the network running | The operator for the agreed provision period, then the owner (§ 72(1) and (5) TKG) | The owner |
| Cost | Provision fee under § 72 TKG: at most €60 a year, €540 per flat, over 5 to 9 years | One-off, per quote |
| Other providers | Access at the handover point free of charge and non-discriminatory (§ 72(6) TKG) | The owner decides |
| Timing | When the operator rolls out in the area | When the owner wants |
| Documentation | As the operator specifies | Fibre plan and a test report per fibre go to the owner |

The provision fee applies to networks built by 31.12.2027. What the planned TKG amendment changes is open until the Bundestag passes it.

## How to recognise a finished in-building network

No visual check shows whether a fibre works. At handover you receive:

**A test per fibre**

- Loss of every fibre from the building distributor to the outlet
- OTDR trace: every splice and connector visible on its own
- Faults such as bends that are too tight are fixed before handover

**Documentation**

- Fibre plan: which fibre leads to which flat or unit
- Labels in the distributor and on every outlet
- Reports in digital form – for the manager, providers and future tenants

With the fibre plan and reports any provider can connect without surveying the building again – and a later fault is found quickly.

## What you get at handover

- Fibre plan with the allocation per unit
- Test and splice report for every fibre, digital
- Labelled distributors and fibre outlets
- Invoice only after handover

## What does in-building fibre cost?

You get a written quote after a site visit or from plans and photos. It states:

- **Installation, splicing, testing:** Per building, per quote
- **Materials:** Cable, ducts, distributors, outlets: itemised
- **Travel:** Stated up front

What drives the price:

- Number of units and floors
- Route: existing shafts and conduits, or new ones
- Fire safety in the staircase
- Access to the flats and coordination with residents
- Materials and travel

 Payment after installation and handover: SEPA bank transfer, invoice or PayPal.

## For an accurate quote

Whatever you do not know, we clarify on the site visit. Photos often help already:

- Type of building and year built
- Number of flats or tenant units, and floors
- Where the fibre entry point is or will be, and which network operator
- Photos of the basement, service room and staircase
- Existing shafts, conduits or trunking
- Whether every unit is connected or some only prepared
- For a WEG: the date of the next owners’ meeting
- A contact for access and appointments

## How a job runs

1. **Enquiry** — Tell us the type of building, number of units and floors, and where the fibre enters – photos of the basement and staircase help. We reply the same working day.
2. **Site visit or plans** — We look at the route on site or work from floor plans and photos: shafts, conduits, staircase, fire safety, access to the flats.
3. **Quote** — You get a written quote with the route, materials and travel. For an owners’ association (WEG) it is the basis for the resolution.
4. **Installation** — Lay the cable, fit the distributors, splice. Appointments inside flats are agreed with the property manager and residents.
5. **Testing and handover** — Every fibre is tested; you receive the fibre plan and reports digitally. Payment is due after handover.

## Frequently asked questions

### Who does this – the network operator, an electrician or a specialist?

The network operator builds up to the fibre entry point in the building (Gf-AP). Everything behind it, up to the flats, the owner can have the operator build or give to a contractor. An electrician can lay ducts and cable; splicing and testing need a splicer and test equipment – that is the part we do, also as a subcontractor to electrical firms.

### Who pays for fibre in an apartment building?

The in-building network is the owner’s responsibility. If a network operator builds it, § 72 TKG lets the operator charge a provision fee (Glasfaserbereitstellungsentgelt) of at most €60 a year and €540 per flat in total, which a landlord may pass on in the service charges (§ 2 no. 15(c) BetrKV). If the owner commissions the work, the owner owns the network and decides which providers connect.

### Who decides in an owners’ association (WEG)?

The association votes on structural changes (§ 20(1) WEG). But every owner can demand a connection to a very-high-capacity network (§ 20(2) no. 4 WEG). Our quote, with the route and a bill of materials, can serve as the basis for the motion.

### Does a tenant have to agree?

Connecting a rented flat to a fibre network for the first time counts as a modernisation measure (§ 555b no. 4a BGB). We agree the work inside the flat with the property manager and residents. Questions about notice and rent are for your property manager or lawyer.

### What if not every flat wants fibre?

We build the riser for the whole building; for flats without an order the fibre can end on their floor and be taken into the flat later with little work. Under the government’s draft TKG amendment, network operators would gain a right to full deployment throughout the building – it is not law yet.

### Is it possible in an old building or without conduit?

Yes. Options are existing shafts, old cable routes, microducts, or a slim surface trunking. We settle the route at the site visit and put it in the quote.

### What applies in the staircase?

Required staircases and corridors are escape routes. Under the federal states’ cable installation guidelines (model: MLAR, section 3), cables there are only permitted if the escape route stays usable long enough in a fire. That is why we fix the staircase route before quoting.

### How tightly can the cable be bent?

Indoors, bend-insensitive fibre to ITU-T G.657 is used; depending on the category the fibre itself tolerates radii down to 10 mm (A1), 7.5 mm (A2) or 5 mm (B3). What counts is the cable’s minimum bend radius on its datasheet – it is larger than the fibre’s.

### Can you extend the fibre inside a house?

Yes – for example from the entry point in the basement to the study or to the router in the living area. Whether we extend the fibre behind the outlet, move the outlet or continue from the fibre modem with network cable, we agree with your provider first.

### How do we pay?

After the work and handover, by SEPA bank transfer, on invoice or with PayPal.

## Standards and sources

- [§ 72 TKG – fibre provision fee](https://www.gesetze-im-internet.de/tkg_2021/__72.html)
- [§ 20 WEG – structural changes](https://www.gesetze-im-internet.de/woeigg/__20.html)
- [§ 2 no. 15 BetrKV – service charges](https://www.gesetze-im-internet.de/betrkv/__2.html)
- [§ 555b BGB – modernisation measures](https://www.gesetze-im-internet.de/bgb/__555b.html)
- [Federal Gigabit Office: cabinet adopts TKG amendment 2026 (25.06.2026, German)](https://gigabitbuero.de/artikel/kabinettsbeschluss-tkg-anderungsgesetz-2026/)
- Model cable installation guideline (MLAR), version of 03.09.2020, section 3
- [ITU-T G.657 – bend-insensitive single-mode fibre](https://www.itu.int/rec/T-REC-G.657)
- [BREKO Marktanalyse 2026 (German)](https://brekoverband.de/wp-content/uploads/2026/09/BREKO_Marktanalyse_2026.pdf)

## Contact

Email: info@utechit.de
Phone: +49 30 50930365


---

## Provider

UltraTech Germany, Leipziger Straße 40, 10117 Berlin
Email: info@utechit.de · Phone: +49 30 50930365 (WhatsApp)
More: https://utechit.de/llms.txt · MCP: https://utechit.de/api/ucp/mcp
