# From an Existing Fibre Cable to Documented Termination Points

> A real fibre termination project: reuse an existing cable, protect the splices and document both connection points. With original installation photos.

URL: https://utechit.de/blog/in-building-fiber-splicing-termination-project
Language: en

Project Snapshot

Location

Germany

Service Type

Fiber Optics

Technologies

Fibre-optic cable Pigtails Termination boxes

Key Results

12 fibres

Existing cable

2

Termination boxes

1 selected fibre

Documented fibre path

Two termination boxes were installed, with one selected fibre spliced to a pigtail at each end. The installation record describes the intended connection points. No numerical optical-loss or throughput result is stated because the source report contains neither.

Quick Answer

Engineers Shamoon and Musa spliced pigtails onto one selected fibre of an existing 12-fibre cable and installed a termination box at each end. The installation record identifies the intended connection points and includes photographs and handling notes. It documents the installation; it does not provide measured optical loss or a speed-test result.

Key Takeaways

- The existing cable remained the basis of the installation; the documented work was termination and box mounting.
- One selected fibre was connected at both ends. Spare adapter positions are not evidence of additional connected fibres.
- Connection records must account for the installed orientation of each box.
- Photographs support the installation record; optical performance needs its own measurement evidence.

## The starting point: an existing cable without the required termination points

An installed [fibre](https://utechit.de/business/in-building-fiber) cable is only part of the connection. The ends must also be prepared for the intended equipment, the fibre path must be identifiable and the delicate splices need protection. This project concerned an existing cable with 12 fibres. The recorded scope was to splice pigtails onto one selected fibre and install a termination box at each end.

**Installation:** Engineers Shamoon and Musa. **Project management and technical coordination:** Ahmed K.

## What was actually installed

The installation record lists two pigtails and two termination boxes. A pigtail has a connector at one end and an unterminated fibre at the other; that fibre end can be spliced to the installed cable. The connector then provides the accessible connection point inside the enclosure. The [FOA termination guide](https://www.thefoa.org/tech/ref/basic/term.html) explains this approach and why connector selection must suit the intended system.

Part of the installation · What the project record supports ·

Cable · Existing cable containing 12 fibres ·

Fibre path · One selected fibre spliced at both ends ·

Termination · One pigtail at each end ·

Enclosures · Two termination boxes with internal splice [storage](https://utechit.de/business/cabling) ·

Handover information · Connection assignment, photographs and handling notes ·

The scope does not mean that every fibre or every visible adapter position was connected. The report identifies one intended path; the other adapter positions are recorded as unused.

Preparation view: the fibre [routing](https://utechit.de/business/network) and tray are visible before final mounting.

## Protecting the splice and keeping the fibre route understandable

The photographs show the incoming cable, routed fibre and pigtail inside the enclosure. The splice is stored within the box rather than left exposed at the cable end. The installation record also includes instructions to keep the boxes closed, avoid pulling on the cable or enclosure and avoid kinking the pigtails or patch leads.

These photographs document the physical assembly. They should not be read as an optical measurement or as proof of a particular transmission rate.

Open-box reference view: cable entry, internal routing and connection positions can be seen together.

## Why the installed orientation belongs in the documentation

The two boxes were installed in different orientations to suit the available space. That makes a casual instruction such as “use the second port” ambiguous: the reader needs to know which side is being viewed and how the box is mounted.

The project record therefore pairs the connection description with a drawing and photographs of the installed boxes. The practical lesson is to document both ends from a defined viewing direction. Counting the visible openings alone is insufficient.

Installed reference view: enclosure orientation is part of the connection record.

## Installation documentation and performance evidence are different deliverables

This case is supported by an installation record and original photographs. The record describes the work, materials, intended connection points and handling precautions. It contains no [OTDR](https://utechit.de/business/fiber-testing) trace, numerical insertion-loss result or network speed test.

Accordingly, this article makes no claim about measured loss, a guaranteed data rate. For the distinction between a physical installation record and an optical test result, see the [FOA testing reference](https://www.thefoa.org/tech/ref/basic/test.html). If measured performance is part of your requirement, specify the [fibre testing and OTDR deliverable](https://utechit.de/business/fiber-testing) when defining the scope.

Additional preparation view: the internal tray separates the stored fibre from the enclosure cover.

## What to prepare for a similar job

For an existing in-building cable, useful starting information includes photographs of both cable ends, available mounting space, any cable markings, the intended equipment and the documentation already available. Agree whether the work covers termination only or also requires optical measurements and equipment commissioning.

The matching services are [fibre splicing](https://utechit.de/business/fiber-splicing) and [in-building fibre installation](https://utechit.de/business/in-building-fiber). These help define the physical work; the measurement scope should be agreed separately.

Based in Berlin, we provide fibre-splicing services for a wide range of installation requirements throughout Germany.

### The Challenge

An existing fibre cable needed defined termination points at both ends. The work also needed a connection record that remained understandable despite the different installed orientations of the boxes.

### Our Solution

Splice a pigtail onto the selected fibre at each end, protect the splices inside the boxes, mount both enclosures and record the connection assignment with photographs and handling notes.

Expert Insight

The useful handover detail was the connection assignment, not the number of visible adapter openings. When two boxes face different directions, a photograph and a clear reference view prevent a port description from being interpreted backwards.

References & Sources

- [ 1 ] [FOA: Fibre-optic termination and pigtails](https://www.thefoa.org/tech/ref/basic/term.html)
- [ 2 ] [FOA: Fibre-optic testing and documentation](https://www.thefoa.org/tech/ref/basic/test.html)

### Working with an existing fibre cable?

Send photographs of both cable ends and describe the equipment and documentation you need.

[Discuss the work](https://utechit.de/contact)

## Frequently Asked Questions

Did this project include a new fibre cable run? The supplied record describes work on an existing 12-fibre cable: pigtail splicing and termination-box mounting. It does not document a new cable run.

Does an unused adapter position mean there is another connected fibre? No. An adapter opening is not proof of a connected fibre path. In this project, one selected fibre was documented as connected at both ends; the other adapter positions were unused.

Does the installation report prove optical loss or network speed? No. This record contains installation details and photographs, but no numerical optical-loss results, OTDR trace or speed test. Those results require their own measurements and documentation.

Ready to Get Started?

## Start a Similar Project

Tell us what you need and the conditions on site. We can discuss the scope and next steps.

[Discuss your project](https://utechit.de/contact?ref=blog-article)[Write on WhatsApp](https://wa.me/493050930365?text=Hi%20UltraTech%2C%20I%20read%20your%20article%20and%20need%20help)[Call](tel:+493050930365)

---

## Provider

UltraTech Germany, Leipziger Straße 40, 10117 Berlin
Email: info@utechit.de · Phone: +49 30 50930365 (WhatsApp)
More: https://utechit.de/llms.txt · MCP: https://utechit.de/api/ucp/mcp